Almost certainly not because I don't think I will have the time to get around to it, and since it's a post-process step, I don't need to get it to SkyWater right away. So naturally it will get bumped down on the priority list. That said, the documentation in the caravel repository shows the bump map and all the pin assignments, and those are final.