looks like tapeout job is working again, please tr...
# shuttle
m
looks like tapeout job is working again, please try on your projects and post here if you have problems
h
Still fighting with my density issue on LI1, everything else would be fine.
So anyone with a low density on their large digital macro will have the same issue, as the
decap_12
has too much
li1
inside.
m
Why not decrease its size?
h
That is my current trial which just failed. If I go with density 25%, everything good execept LI1 density due to too much decap. If I go with density 35% then routing fails. At the moment I am stuck, I need to fix the decap_12 issue.
m
35% seems low. So another path forward could be to try the run_designs.py tool to iterate over density settings
Wheres the config for the digital macro
h
I found a setting that works (30%). I have a bit of a strange design, a pretty big FIFO with quite a bit of hold issues. But now it should work, I hope, now I need to run again the whole flow.