Hello, I am experiencing an issue with the flow. K...
# openlane
m
Hello, I am experiencing an issue with the flow. Kindly see attached images, the flow appears to be completed successfully. However, upon inspecting the files, such as the Synthesis Timing file (which includes both positive setup and hold times), and in the SignOff folder where the summary file indicates that both TNS and WNS are negative, I am confused. If the setup is negative, how can the flow be considered complete? Secondly, do we only need to consider typical corners? If setup and hold times meet in typical corners, can we ignore violations that occur in the SignOff folder? Or do we simply need to ensure that the flow is complete and green, indicating that the design is ready for fabrication?"