<!channel>: To the Chipalooza designers: One short day of early design reviews has made me aware of how much of a difficulty there will be fitting design reviews into 30 minute slots. I have already done a little bit of shuffling around to avoid having more than three design reviews in a row, with some gaps in between to allow for some overruns in the time. I am posting the schedule of design reviews below. If there is a design review right before yours is scheduled, then using today's meeting lengths as a guideline, we may be 10 minutes late getting started. If there are two design reviews in a row before yours, we may end up as much as 20 minutes late. If nothing is scheduled directly before your design review, then we should be able to get back on track and start on time. I am trying to reschedule one of the meetings at the end of Tuesday to break up the longest block of reviews.
Monday:
8:30 to 9:00 Brown-out detector
9:00 to 9:30 High GBW Operational amplifier
9:30 to 10:00 HSXO
10:30 to 11:00 ULP comparator
11:00 to 11:30 Bandgap
11:30 to 12:00 High GBW Operational amplifier
1:00 to 1:30 Programmable PLL
3:00 to 3:30 Overvoltage detector
Tuesday:
8:00 to 8:30 IDAC
8:30 to 9:00 Rheostat
9:30 to 10:00 Programmable PLL
10:00 to 10:30 Ultra-low power comparator
11:00 to 11:30 Low-power 1.8V LDO
11:30 to 12:00 Temperature sensor
1:30 to 2:00 ULP comparator
2:00 to 2:30 POR
2:30 to 3:00 RDAC
3:30 to 4:00 High-speed XO
4:00 to 4:30 Comparator
5:00 to 5:30 Low-power 1.8V LDO
5:30 to 6:00 POR
7:00 to 7:30 Rheostat
7:30 to 8:00 Instrumentation amplifier
8:00 to 8:30 Low-power operational amplifier
8:30 to 9:00 Comparator
9:00 to 9:30 High GBW Operational amplifier
9:30 to 10:00 Bias Generator